contact us image
Head office

Suite 112

150 Minories

London

EC3N 1LS

Tel
+44 (0) 207 347 5450
Fax
+44 (0) 207 347 5451
Southend-on-Sea office

241 Thorpe Hall Avenue

Southend-on-Sea

Essex, SS1 3SG

Tel
+44 (0) 1702 307 554
Fax
+44 (0) 207 702 1097
You can email us at enquiry@stuart-maher.co.uk or use the form below to contact us. We will respond to your enquiry shortly.
Name
E-Mail
Contact phone
Message
Security Code
 

Verification Complete

Submitting...

projects

next image button
LU Track and Civils
Strategic Improvement Programme
thumbnail image
read more
Borough Viaduct
Skanska Civil Engineering
thumbnail image
read more
Paddington CRL Station Design
Scott Wilson Limited
thumbnail image
read more
Shah Habshan Railway
Union Railway / Bechtel
thumbnail image
read more
Notional Infraco Strategy
For Jubilee, Northern and Piccadilly Lines
thumbnail image
read more
West Coast Route Modernisation
Programme management / technical advice
thumbnail image
read more
Crossrail (Atkins)
Track Alignment Design
thumbnail image
read more
Investigation into Network Rail Overruns
 
thumbnail image
read more
West Coast Route Modernisation
Gauging Check / Approval
thumbnail image
read more
Colchester Sth Junction Renewal
Network Rail
thumbnail image
read more
East London Line Extension
Scott Wilson
thumbnail image
read more
West Coast Route Modernisation
Efficiency Review
thumbnail image
read more
Selhurst Depot
Amec Rail
thumbnail image
read more
Network Rail Track Renewals
Amec Spie Rail UK Limited
thumbnail image
read more
Colchester to Clacton Resignalling
Network Rail
thumbnail image
read more
LU Track Programme
London Underground
thumbnail image
read more
Crossrail Project
Rail for London Crossrail Team
thumbnail image
read more
previous image button
circle

Shah Habshan Railway

CLIENT

Union Railway / Bechtel

VALUE

£325,000

PROGRAMME

Permanent Way (Track) / Civil Engineering Design, Construction Programme and Logistics, Operation and Maintenance Plan

CLIENT REQUIREMENT

Develop 250km of Railway and Infrastructure to facilitate the bulk movement of Sulphur from two new Gas Plants at Habshan and Sha, to a new Freight Terminal at Ruwais.

Shah Habshan Railway

 

Stuart Maher Limited's Contribution

 

Commissioned by Bechtel to provide a Permanent Way (Track) and Civil Engineering Design team with capability to deliver a track and earthworks Preliminary Detail Design for the Shah Habshan Railway, Design and Build Tender Process.

 

Detailed works to include:

 

  • Route Optioneering to incorporate Operational, Engineering and Environmental requirements.
  • Develop 250km of Horizontal and Vertical Alignment incorporating operational speed profiling, and passive provision for future long term development.
  • Develop Preliminary layouts for strategic depot facilities to support proposed operation maintenance plan, in addition develop and review options for construction rail head’s and logistics support.
  • Develop the earthworks and formation design to support the proposed alignments, incorporating drainage and ‘wind blown’ sand mitigation requirements.
  • Co-ordination and management of inter-disciplinary technical reviews between ‘in-house’ and external third party designers and suppliers.
  • Production of 3D CAD models and drawings to support the overall Project Deliverable and Schedule.